Zhengzhou Hengyang Industrial Co., Ltd

Commit to recycle waste sources, making earth better.

Manufacturer from China
Verified Supplier
5 Years
Home / Products / Mineral Processing Plant /

2000t/D Complete Mineral Processing Plant Ore Pelletizing

Contact Now
Zhengzhou Hengyang Industrial Co., Ltd
Visit Website
City:zhengzhou
Province/State:henan
Country/Region:china
Contact Person:MrGary
Contact Now

2000t/D Complete Mineral Processing Plant Ore Pelletizing

Ask Latest Price
Video Channel
Brand Name :Hengyang
Model Number :F-0015
Certification :ISO9001
Place of Origin :China
MOQ :1 Set
Payment Terms :T/T
Supply Ability :350sets/month
Delivery Time :35 days
Packaging Details :negociated
Capacity :2000-10000T/D
Color :According to buyers requirement'
Order :made to order
Appplication :mineral ore
Condition :New
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Complete Mineral Industrial Production Line Lead Recovery Production Line

Brief introduction about mineral ore beneficiation line:
The ore processing equipment composes of many equipments, such as jaw crusher, impact crusher, vibrating feeder, belt converyor, ball mill, spiral separator, mixer, rotary kiln,and so on. as to how many equipments needed for each model, it's mainly depended on your situation and your expect about the final product, such as the size of the stone, the grade of the coarse ore and your expect on the final product,etc.

Complete Mineral Industrial Production Line Lead Recovery Production Line

Our Advantages:

1. High efficiency
In crushing, it adopts traditional two-stage and a closed circuit system for ideal fineness. Besides, jaw crushers have large crushing capacity.
2. Saving energy
In grinding and classification, with characteristics of large processing capacity and small floor area, superfine lamination autogenous mill can save energy by more than 85%.
3. Good classifying effects
In classification, hydrocyclone and vibrating screen can enhance the classifying effects.
4. Environmental protection
It adopts the third generation tailings dry stacking technology, which can save energy by 60-80%. Furthermore, it can also protect the environment and build a base for green mine.


Process introduction:

After beneficiation, there are some residual water in ore concentration. So we have to carry on concentrate dehydration to meet the requirements of transportation and smelting.

2000t/D Complete Mineral Processing Plant Ore Pelletizing

500 TPD Ore Processing Line Equipment List for Your Reference

Equipment Size QTY (set) Power (kW) Remarks
Chute feeder 980×1240 1 7.5
Jaw crusher PE400×600 1 30 Cast steel rack
Jaw crusher PEX250×1000 2 37 Cast steel rack
Swaying feeder 600×600 1 2.2
Rotary ball mill Dia2.1×4.0 1 245
Spiral classifier FLG-2000 1 18.5
Magnetic separator CTB900×1800 1 4 2500gs
Magnetic separator CTB750×1800 2 3 1400~180gs

1000 TPD Ore Processing Line Equipment List for Your Reference

Equipment Size QTY (set) Power (kW) Remarks
Chute feeder 980×1240 1 7.5
Jaw crusher PE600×900 1 75 Cast steel rack
Fine jaw crusher PEX250×1200 2 37 Cast steel rack
Vibrating feeder DZ-5 2 0.75×2/set
Ball mill Dia2.7×3.6 1 475
Spiral classifier FLG-3000 1 30
Magnetic separator CTB-1024 1 5.5 2500gs
Magnetic separator CTB-1021 2 4/set 1400~1800gs
Inquiry Cart 0